Skip to content
FOR:CEO
Open navigation
FOR:FACTORY

Manufacturing work centers

Give manufacturing process steps a clear operational home by assigning active work centers in the bill of materials.

Identify where each operation belongs

A work center gives a process step an identifiable place in your production organization. Define the centers your operation needs and reference the active center from the relevant BOM step. This turns a generic instruction such as assembly or finishing into work associated with the right operational resource, without hiding that choice in free text.

Keep the job tied to its released process

When a manufacturing order is released, its process snapshot preserves the ordered steps and their work-center context. Operators execute those steps through the production workflow, with timing, progress and required quality evidence. The initial material pick is intentionally different: it is a stock-preparation step and does not require a production work center.

What to know before you start

Work-center assignment is not a promise of automatic finite-capacity scheduling, machine telemetry or payroll costing. Those requirements need a separate scope discussion.

Practical questions

Does every BOM step need a work center?

Process steps require an active saved center. The mandatory initial material-pick step deliberately has no work center.

Can I replace a work center by editing a job's label?

A released job follows its frozen process. Changes must respect the supported BOM and job lifecycle, not bypass it with a label edit.

See how it fits your business.

Tell us how you work today, which countries you operate in and where the manual work piles up. Our team can help you choose the right starting point and prepare your setup.

FOR

Reconnecting to the server...

Connection lost — retrying in seconds.

Unable to reconnect.
Please retry or reload the page.

Your session has been paused.

Failed to resume your session.
Please retry or reload the page.